The purpose of the project was to build a new data center on the 2ndfloor of the building. Scope consisted of waterproofing the floor-slab, installation of chiller water lines, creation of spill containment areas and drip pans, installation of 30” raised floor, followed by the installation of CRAH units, automatic transfer switches to provide cooling for the entire room. A new drop ceiling was installed, complete with new lighting and relocation of all fire alarm equipment and sprinklers. All components of the installation for this project were then seismically reviewed and additional measures were implemented to meet seismic rating requirements.